1、网上查了一下,负荷分级确实是前苏联传过来的做法。苏联都解体30多年了,咱们居然还在苏联准上修修补 ...
很有意思的上面的4种是“Power supply concept”
图纸里面还有一个“Operating modes of the power supply”的概念,分6种情况:
• Normal mode - Power supply via main electric supply (MES):
• Reserve mode - Power supply via reserve electric supply (RES):
In case of failure of MES feeding, operational RES feeding (monitoring via the energy
control system) is automatically switched in and supply consumers through internal
10kV ring.
• Emergency mode - Self generated power supply:
In case of simultaneous interferences (failures) of MES and RES feeding, all network
feeding switches will be opened and the EPS bars per branch will be supplied by the
EPS.
• Evacuation mode - Self generated power supply:
• Trial operation - Self generated power suppl:
• Uninterrupted reversion:
1、这里面的Emergency mode就是类似于我们特级负荷应配置第三电源的概念,主供电源和被供电源失效之后才会切入这个模式。
2、在GB55024-2022里面 与这个Emergency mode对应的电源(应为第三电源)规范采用了“应急电源”这个称呼(3.1.3条);“Safety power supply”对应的电源也用了“应急电源”这个称呼(术语);“Backup power supply”对应的电源采用了“备用电源”(术语)。
3、所以问题就是出在3.1.3条这个条文上,它直接采用第三电源的概念,根本不会有后边的争议。
4、Reserve、Backup、Standby、Energency、safety明明是五个不同的单词,但是前三个都被翻译成了“备用”,后两个都被翻译成了“应急”,部分规范编制人员对于外来的概念根本没有吃透。术语章节其实已经把相关概念与国际接轨了,但是到了具体章节编制时候,负责编制的大佬又不能做到统一执行。
|
|