李 慧(中国建筑西南设计研究院有限公司,成都市 610042)
毛彦永(密歇根大学安娜堡分校,美国安娜堡市 48109)
Application of Distributed Energy Storage in Chengdu Science Fiction Museum *
LI Hui(China Southwest Architectural Design and Research Institute Corp. Ltd,Chengdu 610042,China)
MAO Yanyong(University of Michigan - Ann Arbor,Ann Arbor 48109,USA)
Abstract:By means of demonstration application of electrochemical energy storage in the main venue of the 81st world science fiction confence in 2023 — Chengdu Science Fiction Museum project,the application points of user‑side distributed energy storage in civil building are analyzed in terms of application scenario,grid access voltage,access system scheme,operation strategy and other aspects.
Key words:distributed energy storage;Chengdu Science Fiction Museum;operation strategy;power supply system;point of interconnection;power conversion system;voltage of interconnection;gateway metering
摘 要:通过电化学储能在2023年第81届世界科幻大会主场馆 —— 成都科幻馆项目的示范应用,重点从应用场景、并网接入电压、接入系统方案、运行策略等方面分析用户侧分布式储能在民用建筑的应用要点。
关键词:分布式储能;成都科幻馆;运行策略;电源系统;并网点;储能变流器;并网电压;关口计量
中图分类号:TU242.5 文献标识码:A
doi:10.3969 / j. issn.1003 - 8493.2024.08.008